Barge tied off and ramp being set-up
Barge ramp being built
Chip spreading fleet ready to offload
The barge line up
The barge offloaded and the ramps being cleaned up
Cubes set-up at staging area
The barge departing
Transferring from cube to truck
Keeping the chips out of the weather
R. Downing - Consultant
Checking out the truck
Distributor truck spraying a driveway
Spraying a driveway
View from the chip spreader
Smoothing out the chips
Working the chips
Hello from Gambell
Roller working North Beach Road
North Beach Road
The spray bar
Working the chip spreader
In sync laying it down
Ready for another spray run
High Float process
Rolling the chips
Watching for clogged spray nozzles
Guiding the chip spreader
A break in spraying
Ready for another run
Spraying with the distributor truck
Covering with chips
Chip spreader following the distributor truck
Equipment working in sync
Moving the excess chips around
Russia on a beautiful day in Gambell
Jeanne Lavendar Street
1st barge ready to be loaded
Halfway loaded
One more 740 to go
1st barge ready to depart
Pulling the ramps
Off to Nome
1002-10 Road
Housing Street
Driveway
Cleaned up pit area
Cleaned up staging area
Barge Landing
Aerial view of Gambell